Enter your details in the form below to be added to our News Alerts list.
The Kwyjibo Project is a significant rare earth deposit located on Québec’s Côte-Nord, strategically positioned to meet growing global demand for critical minerals essential to the energy transition and advanced technologies.
Located at Kwyjibo
(2,67 ha)
Located at Sheldrake(11,86 ha)
10x smaller (Mine) 15% less (Hydromet Plant)
8,48 Mt @ 2,45 % TREO Measured + Indicated
Neodymium (Nd) · Praseodymium (Pr) · Dysprosium (Dy) · Terbium (Tb) · Yttrium (Y) 45% of Kwyjibo TREO 92% of Project Revenue
Initial mine life
Direct operating jobs
Indirect jobs
Construction jobs
Priority for local training, hiring and procurement
Strong PEA economics supported by a compact, infrastructure-led project concept.
SOURCE: 2026 PEA STUDY FOR THE KWYJIBO PROJECT PREPARED FOR NORDIQUE CRITICAL METALS INC. BY DRA AMERICAS INC.
1. KWYJIBO UNDERGROUND MINE SITE
Underground mine • 2.67 ha surface platform
2.HYDROMET COMPLEX (SHELDRAKE)
Crushing • Concentration • Hydrometallurgy • 11.86 ha
ACCESS ROAD
Dedicated 144 km road connecting both sites
NO SURFACE TAILINGS
˃ Mine site: No surface tailings storage.
˃ Processing plant: Engineering assessment underway to eliminate surface tailings storage.
˃ Underground return: Targeting the return of all project residues underground as cemented paste backfill, at concentrations comparable to those naturally present in the rock before mining.
Technical concept + design
basis
Baseline, metallurgy,
geochemistry,
hydrogeology
Engineering + updated
economics
Environmental review +
consultation
Infrastructure +
construction subject to
approvals
Nordique prioritizes ongoing consultation with Innu and local communities to help plan, monitor, and operate the Project, while identifying mutually beneficial opportunities and partnerships.
Enter your details in the form below to be added to our News Alerts list.