Kwyjibo • Project Infrastructure Outside Protected Zones

1.KWYJIBO UNDERGROUND MINE SITE
Underground mine • 2.67 ha surface platform

2.HYDROMET COMPLEX (SHELDRAKE)
Crushing • Concentration • Hydrometallurgy • 11.86 ha

ACCESS ROAD
Dedicated 144 km road connecting both sites

INFRASTRUCTURE OUTSIDE PROTECTED ZONES
Mine • Processing complex • Access road outside mapped biodiversity reserves

Click map to enlarge.

Kwyjibo • 2018 → 2026 • A Fundamentally Different Project

2018

2026

Mine + Crusher + Concentrator at Kwyjibo (21 ha)

No Crusher and Concentrator at Kwyjibo Mine (2.67 ha)

Hydromallurgical Complex at Sept-Îles (13.25 ha)

Hydromallurgical Complex at Sheldrake (11.86 ha)

Residue storage at surface (Th, U, P, S)

No surface residue storage 

All residues return underground (Th, U, P, S)

Concentrate transport from: Kwyjibo to Sept-Îles

Raw Ore transport from: Kwyjibo to Hydromallurgical Complex

Kwyjibo • Residue Management Moves Underground

RESIDUES FROM CONCENTRATOR & HYDROMETALLURGICAL PLANT

Click to enlarge

ALL RESIDUES FROM CONCENTRATOR & HYDROMETALLURGICAL RETURNED UNDERGROUND AS PASTE BACKFILL

Click to enlarge

2026 Design Principle

Further geochemical, hydrogeological and radiological characterization is required in the next study phases.

Avoid permanent surface storage at the Kwyjibo mine site for the residue streams returned as backfill.

Kwyjibo • Potential Partnership With Local Community

Nordique’s objective is to advance Kwyjibo through structured, long-term partnerships with Innu Nations and local communities — extending beyond consultation to meaningful participation as the Project develops.

01

Development

Work together as engineering advances so local knowledge, land use and community priorities can inform project planning.

02

Monitoring

Create opportunities for community participation in environmental follow-up, field programs and long-term stewardship.

03

Participation

Prioritize pathways for
training, employment, local
procurement and community businesses throughout development and operations.

04

Shared Raise

Work toward mutually
beneficial arrangements that allow communities to
participate in the long-term
value created by the Project.

QUÉBEC PRECEDENT Recent Côte-Nord examples show that mining proponents and First Nations can use formal engagement and cooperation agreements to establish expectations early, incorporate community input and build a pathway toward longer-term social acceptance and participation.

Enter your details in the form below to be added to our News Alerts list.